Manufacturing Technology of Pre-Tensioned Multi-Cavity Interior Plate through Continuous Molding Way

Authors

  • Egamberdiyeva Tutiyo Namangan Engineering, Construction Institute

Keywords:

Mold, technology, intermediate, multi-cavity plate, prestressing

Abstract

The main legal rule of continuous production should be the full use of installed equipment, a complex of mechanization, and automation of the production process. This rule assumes that the operations performed at each workplace are performed at the same time, with the cycle period being adjusted to each other. In order to work at a rhythm, it is required to keep the set amount of time constant while performing a certain operation and follow a cycle with a fixed time interval.

Downloads

Published

2023-03-27

How to Cite

Tutiyo, E. . (2023). Manufacturing Technology of Pre-Tensioned Multi-Cavity Interior Plate through Continuous Molding Way. Procedia of Philosophical and Pedagogical Sciences, 2(3), 63–72. Retrieved from https://procedia.online/index.php/philosophy/article/view/477